NORD Drivesystems BU0220 User Manual

Page 21

Advertising
background image

2 Assembly and installation

BU 0220 GB-0912

Subject to technical amendments

21

2.2.2.1 Control connections SK CU4-PBR

The terminal bar of the customer unit SK CU4-PBR is divided into two potential levels.

Connection of up to 2 sensors is made on the terminal bar (terminals C1 and C2).

NOTE

Looping of the 24V supply voltage (terminals 40/44) is possible, however a maximum
current load of 2A for the SK CU4-PBR must not be exceeded.

46

81

82

47

83

46

81

82

44

40

78

77

C2

C1

40

44

PBR A

PBR B

PBR A

PBR B

Sys+

Sys-

GND B

GND B

VP +5V

Incoming
PROFIBUS DP cable

Outgoing
PROFIBUS DP cable

Connection of the 24V power
supply from the SK 2xxE

System bus connection

from the SK 2xxE

Potential level:

System bus

Potential level:

Field bus

24V

GND

Connection to the

terminal block of the SK CU4-PBR

SK CU4-

SK 2xxE-

Advertising