Operational test – Fluid Management 5G-HD Harbil 5-Gallon Shaker User Manual

Page 21

Advertising
background image

Fluid Management Customer Service 1 . 800 . 462 . 2466

Harbil 5G Mixer | 19

Operational Test

Operational Test Procedure

1.

Plug in the mixer.

2.

Using two one-gallon containers followed by a five-gallon container, perform

these steps:

• With the one-gallon containers in position on the table, set the TIMER to

its minimum value.

• Twist the EMERGENCY STOP to release it.

• Depress the POWER switch.

• With one hand on the EMERGENCY STOP, depress the START switch.

The unit should cycle automatically—clamping down and starting the

shake cycle with a smooth, vibration-free movement.

3.

If vibrations are noticed, immediately press down the EMERGENCY STOP

switch.

• Mild vibrations may occur because the unit is not properly leveled. Try

slipping a piece of paper under each of the four (4) adjustable feet. If

the paper easily slides under a foot (feet), then the mixer is not solidly

contacting the floor. Level as necessary.

• Severe or persistent vibrations may be caused by a variety of problems.

Check to make sure that the struts are moving freely. If they are, then

contact a qualified service technician or Customer Service at Fluid

Management for assistance before continuing to operate the mixer.

4.

Repeat the above steps using a 5-gallon container.

5.

When the unit is operating smoothly, replace and secure the top cover and

upper rear cabinet with the screws.

6.

Your high speed paint mixer is now ready for operation. Please read the next

two sections to familiarize yourself with the machine and how to operate it

safely.

Operational

Test

Advertising