Changing shake motor – Fluid Management 5G-HD Harbil 5-Gallon Shaker User Manual
Page 35
Fluid Management Customer Service 1 . 800 . 462 . 2466
Harbil 5G Mixer | 33
Changing Shake Motor
Read all of the following instructions. If you have any doubt about performing these
procedures, please contact Customer Service at Fluid Management.
Turn to the Parts Section of this manual for component identification and location.
Changing Shake Motor Procedure
1.
Unplug the electrical cord.
2.
Remove lower front and right/left side panels.
3.
Make a drawing of the wire to the terminal connections, then disconnect the
wires from the shake motor.
4.
Remove the 4 hold-down screws on the motor.
5.
Remove the V-belt from the pulley on the motor.
6.
Remove and replace the motor.
7.
Remove the pulley from the old motor by loosening the set screw.
8.
Reposition the wires on the new shake motor by following the drawing made
in Step 3.
9.
Reinstall the pulley on the new motor.
10.
Put the V-belt on the balance groove pulley, then on the motor pulley.
11
. Align the motor pulley with the groove pulley on the crankshaft.
12
. Install and tighten down the 4 motor hold-down screws while keeping tension
on the belt.
13.
Be sure to adjust the shake motor for proper tension on the V-belt. The
deflection should be approximately 3/16” at 5 pounds of pressure.
14.
Reassemble the paint mixer by reversing these instructions.
15
. With a paint container in position, perform a test run of the mixer to be sure
that it is operating correctly.
Changing
Shake Motor