Removing shake frame, Remove the counterweights – Fluid Management 5G-HD Harbil 5-Gallon Shaker User Manual

Page 32

Advertising
background image

30 | Harbil 5G Mixer

Fluid Management Customer Service 1 . 800 . 462 . 2466

Removing Shake Frame

CAUTION

The inner frames weigh 21 pounds each!

Remove the Counterweights Procedure

1.

Remove the 2 lower inner frame counterweights to access the nuts on the

flange bearings and the rear screws and nuts on the pillow block bearings.

Note: DO NOT REMOVE the 2 upper inner frame counterweights.

Use two 1/2” wrenches, or a ratchet and a 1/2” wrench

to remove the 2 lower nuts and screws holding the lower

weights to the inner frame to allow access to the crankshaft.

2.

With two 1/2” wrenches or a ratchet and a 1/2” wrench, loosen BUT DO NOT

REMOVE the 4 screws securing the flange bearings to the shake frame.

Remove the 4 nuts.

Figure 8. Flange Bearings

Remove the

Counterweights

Flange Bearing

Flange Bearing Screw

washer

Flange Bearing Nut

Advertising