Installing rubber pads – Fluid Management 5G-HD Harbil 5-Gallon Shaker User Manual

Page 39

Advertising
background image

Fluid Management Customer Service 1 . 800 . 462 . 2466

Harbil 5G Mixer | 37

3.

Making sure the pad is positioned properly, attach the pad to the plate and

hold in position for about 2 minutes.

4.

Remove the backing from the tape on the replacement lower table and press

into position.

5.

After attaching the pads, place four 1-gallon cans on the table.

6.

Turn on the mixer. Allow the top plate to lower onto the cans and Turn off the

mixer before it goes into the shaking cycle.

This step is only to press the pads in place during drying of the glue.

DO NOT ALLOW THE MIXER TO SHAKE THE CANS OF PAINT.

7.

Unplug the electrical cord as a safety precaution.

8.

Allow the adhesive to dry overnight.

9.

After the adhesive has dried, open the mixer, remove the cans and test as

appropriate.

At this point, the mixer should be ready for normal operation.

Installing Rubber Pads

Advertising