Installing rubber pads – Fluid Management 5G-HD Harbil 5-Gallon Shaker User Manual
Page 38
36 | Harbil 5G Mixer
Fluid Management Customer Service 1 . 800 . 462 . 2466
Read all of the following instructions. If you have any doubt about performing these
procedures, please contact Customer Service at Fluid Management.
For component identification and location, consult the Parts Section of this manual.
A special rubber pad is fastened to the top plate to hold cans in place during
operation.
When attaching the rubber pad to the upper plate, use P/N 4000327,
Loctite Super Bonder #416 Instant Adhesive. Follow the instructions on the
adhesive for the drying time. Use protective gloves when applying the adhesive.
Installing Rubber Pads Procedure
1.
Apply a non-flammable solvent to remove the old adhesive.
2.
Apply the permanent adhesive to the pad. Follow the glue pattern shown in
the diagram.
Figure 10. Glue Pattern
Installing
Rubber Pads
Installing Rubber Pads
glue pattern
Top Plate Assembly