Removing shake frame – Fluid Management 5G-HD Harbil 5-Gallon Shaker User Manual

Page 30

Advertising
background image

28 | Harbil 5G Mixer

Fluid Management Customer Service 1 . 800 . 462 . 2466

Removing Shake Frame

Some service procedures involve removing the shake frame. Read all of the

following instructions. If you have any doubt about performing these procedures,

please contact Customer Service at Fluid Management. For component identification

and location, refer to the Parts Section of this manual.

Removing Shake Frame Procedure

1.

Remove the sheet metal covers (see OPENING THE MIXER, page 27).

2.

To facilitate the reassembly process, mark or prepare a drawing of the

2 wires running from the left side of the terminal block to the control box.

3.

Using a small blade screwdriver, disconnect the 2 wires.

4.

Pull the cable containing the 2 wires through 2 tie wraps, or snip and remove

the tie wraps with side cutters.

Figure 6. Disconnecting the 4 Wires at the Terminal Block

Removing

Shake Frame

black

red

red

black

Advertising