Changing the v-belt – Fluid Management 5G-HD Harbil 5-Gallon Shaker User Manual

Page 36

Advertising
background image

34 | Harbil 5G Mixer

Fluid Management Customer Service 1 . 800 . 462 . 2466

Read all of the following instructions. If you have any doubt about performing these

procedures, please contact Customer Service at Fluid Management.
Refer to the Parts Section for component identification and location.

Changing the V-Belt Procedure

1.

Unplug the electrical cord.

2.

Remove all the sheet metal covers (see OPENING THE MIXER, page 27).

3.

Loosen the screws and nuts on the flange bearings.

4.

Slide the shake frame away from the right side of the crankshaft.

5.

Remove the flange bearing on the right side of the machine.

6.

Loosen the shake motor mounting screws and slide the motor toward the

crankshaft, thereby loosening the V-belt. Remove the V-belt.

7.

Put the new V-belt on the balance groove pulley, then on the motor pulley.

8

. Install and tighten down the 4 motor hold-down screws while keeping tension

on the belt.

9.

Be sure to adjust the shake motor for proper tension on the V-belt. The

deflection should be approximately 3/16” at 5 pounds of pressure.

10.

Reassemble the paint mixer by reversing these instructions.

Changing

the V-Belt

Changing the V-Belt

Advertising