Changing the v-belt – Fluid Management 5G-HD Harbil 5-Gallon Shaker User Manual
Page 36
34 | Harbil 5G Mixer
Fluid Management Customer Service 1 . 800 . 462 . 2466
Read all of the following instructions. If you have any doubt about performing these
procedures, please contact Customer Service at Fluid Management.
Refer to the Parts Section for component identification and location.
Changing the V-Belt Procedure
1.
Unplug the electrical cord.
2.
Remove all the sheet metal covers (see OPENING THE MIXER, page 27).
3.
Loosen the screws and nuts on the flange bearings.
4.
Slide the shake frame away from the right side of the crankshaft.
5.
Remove the flange bearing on the right side of the machine.
6.
Loosen the shake motor mounting screws and slide the motor toward the
crankshaft, thereby loosening the V-belt. Remove the V-belt.
7.
Put the new V-belt on the balance groove pulley, then on the motor pulley.
8
. Install and tighten down the 4 motor hold-down screws while keeping tension
on the belt.
9.
Be sure to adjust the shake motor for proper tension on the V-belt. The
deflection should be approximately 3/16” at 5 pounds of pressure.
10.
Reassemble the paint mixer by reversing these instructions.
Changing
the V-Belt
Changing the V-Belt