6 commissioning, 1 before initial switch-on, Commissioning – Lenze E84AYCIB User Manual

Page 33: Before initial switch-on

Advertising
background image

EDS84AYCIB EN 4.0 - 11/2010

L

33

E84AYCIB communication manual (INTERBUS)

Commissioning

Before initial switch-on

6

Commissioning

During commissioning, system-specific data such as motor parameters, operating

parameters, responses, and parameters for fieldbus communication are defined for the

controller. For Lenze devices this is effected via the so-called codes.
The codes of the controller and for communication are saved non-volatilely as a data set in

the memory module.
Additionally there are codes for diagnostics and monitoring of the nodes.



Parameters of the communication module

( 63)

6.1

Before initial switch-on

Stop!

Before switching on the standard device with the communication module for

the first time, check the entire wiring for completeness, short circuit, and earth

fault.