7 final works, 1 preparing the commissioning procedure, Final works – Lenze E94ASHExxxx User Manual

Page 123: 7final works

Advertising
background image

Final works

Preparing the commissioning procedure

7

123

EDK94SH366 DE/EN/FR/ES/IT 3.1

7

Final works

7.1

Preparing the commissioning procedure

For commissioning you require the following:

ƒ

A computer with Windows® operating system (XP or 2000)

ƒ

The Lenze PC software »Engineer«

ƒ

A connection to the controller via an interface, e.g.:
– Diagnostic interface X6 with USB diagnostic adapter
– System bus CAN
– Communication modules in the extension slots M1/M2

ƒ

The Software Manual for the technology application used

ƒ

The Communication Manual for the automation platform network

ƒ

Mains voltage or 24-V voltage supply for control electronics of the controller

Follow the software instructions and/or read the documentation.

Advertising