Commissioning
Before initial switch-on
5
Commissioning
During commissioning system-specific data such as motor paramters, operating
parameters, responses, and parameters for fieldbus communication are specified for the
controller. In the case of Lenze devices this is carried out via the so-called codes.
The controller and communication codes are saved non-volatilely as a data record in the
memory module.
In addition there are diagnostic and monitoring codes for the nodes.
5.1
Before initial switch-on
Stop!
Before you switch on the Inverter Drive 8400 protec for the first time, check the
entire wiring for completeness, short circuit, and earth fault.