Commissioning

Before initial switch-on

5

Commissioning

During commissioning system-specific data such as motor paramters, operating

parameters, responses, and parameters for fieldbus communication are specified for the

controller. In the case of Lenze devices this is carried out via the so-called codes.
The controller and communication codes are saved non-volatilely as a data record in the

memory module.
In addition there are diagnostic and monitoring codes for the nodes.



Parameter reference

( 67)

5.1

Before initial switch-on

Stop!

Before you switch on the Inverter Drive 8400 protec for the first time, check the

entire wiring for completeness, short circuit, and earth fault.