Required commissioning steps (short overview)
56
Lenze · i700 servo inverter · Reference manual · DMS 1.5 EN · 03/2014 · TD05
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5.1.3
V/f characteristic control for asynchronous motor (ASM)
Required commissioning steps
1.
Wiring check by means of manual test modes
2.
3.
Accepting/adapting plant parameters
4.
Compensating for inverter influence on output voltage
5. Only required if voltage vector control, DC-injection braking, or flying restart process is activated:
Setting and optimising the current controller
6.
Defining the V/f characteristic shape
7.
8.
9.
Activating the voltage vector control (lmin controller)
10.
Defining the behaviour at the current limit (Imax controller)
Optional commissioning steps (additional function or fine adjustment)
A.
B.
"DC-injection braking" function
C.
D.