Installation and wiring, Chapter, Introduction – Rockwell Automation 193-EDN E1Plus Overload Relays - DeviceNet Module User Manual

Page 5

Advertising
background image

1

Publication 193-UM006A-EN-P – October 2005

Chapter

1

Installation and Wiring

Introduction

The purpose of this chapter is to provide the necessary instructions to
successfully install a 193-EDN DeviceNet Module to an E1 Plus Overload
Relay and properly connect to a DeviceNet network.

ATTENTION

To prevent electrical shock, disconnect from power source
before installing or servicing. Install in suitable enclosure.
Keep free from contaminants.

ATTENTION

The side mount module contains ESD (electrostatic
discharge) sensitive parts and assemblies. Static control
precautions are required when installing, testing, servicing,
or repairing this assembly. Component damage may result
if ESD control procedures are not followed. If you are not
familiar with static control procedures, refer to Rockwell
Automation publication 8000-4.5.2, “Guarding Against
Electrostatic Damage
”, or any other applicable ESD
protection handbook.

ATTENTION

The purpose of this document is to serve as a guide for
proper installation. The National Electrical Code and any
other governing regional or local code will take precedence.
Rockwell Automation cannot assume responsibility for the
compliance or proper installation of the side mount
module or associated equipment. A hazard of personal
injury and/or equipment damage exists if codes are ignored
during installation.

ATTENTION

An incorrectly applied or installed side mount module can
result in damage to the components or reduction in
product life. Wiring or application errors such as supplying
incorrect or inadequate supply voltage, or
operating/storing in excessive ambient temperatures may
result in malfunction of the product.

Advertising