Rockwell Automation 1788-CN2DN ControlNet-to-DeviceNet Linking Device Installation Instructions User Manual

Page 14

Advertising
background image

14 ControlNet-to-DeviceNet Linking Device

Publication

1788-IN052D-EN-P - February 2007

3. Loosen the two left-most terminal screws of the power

connector.

4. Insert the bare power supply wire ends into the left-side

terminals of the power supply connector using the diagram as
a guide.

5. Tighten the two left terminal screws using 0.6 Nm (7 in-lb)

torque.

6. If you choose to connect another device to the power supply

connector of the CN2DN device, loosen the two terminal
screws on the right side of the connector.

7. Insert the bare device power wire ends into the two right

terminals using the diagram as a reference.

8. Tighten the two right terminal screws using 0.6 Nm (7 in-lb)

torque.

9. Insert the power supply connector into the power supply

connector port.

10. Reapply power to the dc power supply.

The LED indicators on the right side of the CN2DN device will
flash red to indicate power has been connected.

You have completed wiring the power supply to the CN2DN device.

IMPORTANT

Do not connect more than two wires to any terminal.

IMPORTANT

The power supply connector must be inserted into the CN2DN
device for power to reach any devices daisy chained from the
CN2DN power supply connector.

Advertising