Rockwell Automation 1785-BCM_BEM, D17856.5.4 PLC-5 Backup Communication Module User Manual User Manual

Page 40

Advertising
background image

Installing Your PLC-5 Backup System

Chapter 3

3-17

6.

Connect the other end of the 1770-CD cable to terminals 1, 2, and 3
on the wiring arm of the Re

r

mote I/O Adaptor module as shown in

Figure 3.10.

Making Data Highway Plus Connections

Figure 3.11 shows Channel 1A configured to establish communication
with Data Highway Plus network (default configuration). The connections
you must make for your PLC-5 backup system are between the:

PLC-5 and the 1785-BCM module
two 1785-BCM modules
1785-BCM module and Data Highway Plus network

Steps to make these connections follow the figure.

Figure 3.11
Data Highway Plus Connections

L o c a l I/O C h a s s is

L o c a l I/O C h a s s is

1 7 9 8 6

PLC-5 processor

PLC-5 processor

HSSL and Remote I/O link were previously connected but are not
shown for clarity.

Connections show default configuration with Channel 1A as Data
Highway Plus and Channel 1B as Remote I/O Scanner.

Make all connections with 1770-CD cable.

1785-BCM Module

1771-P4S
Power Supply

Data Highway Plus

Data Highway Plus Network

1785-BCM Module

1771-P4S
Power Supply

Advertising