Installing Your 1785-BEM Module

Chapter 4

4-21

5.

Connect one end of a 1770-CD cable to terminals 15, 16, and 17 on
the wiring arm of one of the 1785-BEM modules as shown in
Figure 4.15.

Figure 4.15
Channel 2B Connections Added Between a 1785-BEM Module
and Data Highway Plus Network or Remote I/O Link

1771 –P4S
Power Supply

1771 –P4S
Power Supply

1785 –BCM Module

Local I/O Chassis

Local I/O Chassis

1785 –BEM Module

1785 –BCM Module

1785 –BEM Module

Data Highway Plus – connect the signal conductors with Clear, Shield, and Blue insulation to

terminals 15, 16, and 17 of 1785 –BEM modules respectively.

Remote I/O – connect the signal conductors with Blue, Shield, and Clear insulation to terminals 15, 16, and 17 of

1785 –BEM modules respectively.

Data Highway Plus
network or Remote I/O

19096

Channel 2B

See Note

Shield

See Note

Wire channel for either Data Highway Plus or Remote I/O.

PLC-5/40, -5/60, -5/80

PLC-5/40, -5/60, -5/80

6.

Connect the other end of the 1770-CD cable to terminals 1, 2, and 3
on the wiring arm of the Data Highway Plus network or remote I/O
link as shown in Figure 4.15.

Now that you’ve installed your 1785-BEM module, you are ready to start
up your system. Before doing so, double check all connections against the
procedures described in this chapter. Chapter 5 describes the operation of
the 1785-BCM module and the backup system and shows procedures for
starting up and operating your system.

What to Do Next

Advertising