Rockwell Automation 1785-BCM_BEM, D17856.5.4 PLC-5 Backup Communication Module User Manual User Manual

Page 57

Advertising
background image

Installing Your 1785-BEM Module

Chapter 4

4-14

Making Channel 2A Connections

Figure 4.8 shows the Channel 2A connections you must make for your
PLC-5 backup system. These connections are between the:

PLC-5/40 or PLC-5/60 processor and the 1785-BEM module
two 1785-BEM modules
1785-BEM module and Data Highway Plus network or remote I/O link

Figure 4.8
Channel 2A Connections

1785-BCM module

1785-BEM module

Local I/O Chassis

Local I/O Chassis

Data Highway Plus network or Remote I/O link

Channel 2A

19089

1785-BCM module was connected in Chapter 3 but is not shown for clarity.

1785-BCM module

1785-BEM module

PLC-5/40, -5/60, -5/80

PLC-5/40 or -5/60

1771-P4S
power supply

1771-P4S
power supply

1.

Connect one end of a 1770-CD cable to Channel 2A on one of the
PLC-5/40 or PLC-5/60 programmable controllers, as shown in
Figure 4.9.

Advertising