Installation

Hardware

Dimensions

Power Connection

To comply with the CE Low Voltage Directive (LVD), this equipment must be
powered from a source compliant with Safety Extra Low Voltage (SELV) or
Protected Extra Low Voltage (PELV).

To comply with UL restrictions, this equipment must be powered from a source
compliant with Class 2 or Limited Voltage/Current.

ATTENTION: Do not wire more than one conductor on any single terminal.

80 mm
(3.15 in)

136 mm
(5.35 in)

152 mm
(5.98 in)