Rockwell Automation 1788-CN2FFR EtherNet/IP and ControlNet to FOUNDATION Fieldbus Linking Device User Manual

Page 32

Advertising
background image

30

Rockwell Automation Publication 1788-UM057B-EN-P - September 2014

Chapter 2

Set Up in the Studio 5000 Logix Designer Application

Auto MacroCycle

Calculates the Macro Cycle based on the configured field devices and the number
of PVs configured. A window is also added for class II data communication.

Advanced

Opens the Advanced Settings window.

Load Defaults

Resets the configuration settings to their default values.

Update Master Time

Update the master time to local computer time.

Download Schedule

Download schedule to linking device.

Enable Schedule

The default is enabled. Used only when the Disable Schedule Function disables
the schedule.

Clear Schedule

Clear the schedule from the linking device and the AOP.

Disable Schedule

Disable the schedule from executing in the linking device.

Advanced

The Advanced button on the master configuration page launches the Master
Advanced configuration dialog box (see

Master Configuration on page 28

).

TIP

This task is performed automatically when field devices are added or edited.

IMPORTANT

This action causes the module to stop

compelling

data.

IMPORTANT

We recommend that you do not alter these settings; doing so can cause loss of
communication.

Advertising
This manual is related to the following products: