Enter data manually – Rockwell Automation FactoryTalk Report Expert User Guide User Manual

Page 112

Advertising
background image

Chapter 8 Editing Event and Production Data

112

Rockwell Automation Publication RPTEXP-UM001H-EN-P-June 2014

The Shift information list contains the following items:

Item

Description

Activity Area

The name of the activity area.

Start/End Time

The time the shift instance started/ended.

Name

The name of the shift instance.

Number

The number of the shift instance.
For off-shift instances, the value in this field is negative.

Actions

A column containing the Split and Edit buttons for each shift

instance in the list.

Edit

A button for editing the details of the selected shift instance.

Split

A button for splitting the selected shift instance.

On the Enter Data Manually page, you can:

• View shift summary information based on the activity area and

shift details of your choosing.

• Manually enter production data.
• Manually enter event data.

Depending on the data you want to enter, you need to select the
Production or Events option in the Select area and shift details
panel. By default, the Production option is selected. For more

information on using the options, see "Select Area and Shift Details
Panel" (page 113).

The following panels are always displayed on the Enter Data
Manually page, irrespective of the selected option:

• Parameter set information (page 113).
• Select area and shift details (page 113).
• Shift summary (page 114).

Enter Data Manually