Editing the start/end value – Rockwell Automation FactoryTalk Report Expert User Guide User Manual

Page 121

Advertising
background image

Editing Event and Production Data Chapter 8

Rockwell Automation Publication RPTEXP-UM001H-EN-P-June 2014

121

NOTES

You cannot change the event time in such a way that it overlaps
with the time of the next or previous event collected with the
same configuration.
If the event occurrence has any records whose end time is earlier
than the modified start time of the event, these records are
deleted.

Similarly, if the event occurrence has any records whose start
time is later than the modified end time of the event, these

records are deleted as well.
If the event is continuous, the end time of the previous event

occurrence and the start time of the next event occurrence are
synchronized with the modified start and end time of the event.

There are several restrictions related to modifying the start/end

values of events. You can change the start/end value provided that
the event configuration fulfills the following conditions:

• It is user defined.
• It is not active (i.e., it is not currently processed by the

FactoryTalk Metrics server).

• Its value type set in FactoryTalk Metrics is one of the

following:

• Collect Value at the Start of the Event.
• Collect Value at the Start and the End of the Event.
• Collect Value at the End of the Event.
• Accumulate Value for the Duration of the Event.

Review the following for additional information.

For this value type of a FactoryTalk

Metrics Event:

You may edit this field:

Collect Value at the Start of the Event

Start Value

Collect Value at the End of the Event

End Value

Editing the Start/End Value

Advertising