Editing Event and Production Data Chapter 8

Rockwell Automation Publication RPTEXP-UM001H-EN-P-June 2014

115

Item

Description

Sched Unavail

The time between Shift Time and Sched Avail (i.e., Shift
Time - Sched Avail).

Unavailable

The total time when the activity area was in the Unavailable
state during the shift (i.e., Sched Avail - Avail).

Downtime

The total time when the activity area was in the Downtime

state during the shift (i.e., Avail - Running).

Good Parts

The number of good parts produced.

Scrap Parts

The number of parts rejected due to poor quality.

Total Parts

The total number of parts produced in the specified period
of time (i.e., the sum of good parts and scrap parts).
When editing the number of parts, Total Parts should not

exceed Max Parts.

Max Parts

The maximum number of parts which could have been
produced in the specified period of time. The number is
calculated as the multiplication of Ideal Cycle Time and

Running Time.

The shift summary information is updated when you save your
modifications, or when you change the view of the page by clicking

Production or Events.

You can create new events from scratch (page 115), or from already
existing events (page 116).

To create a new event from scratch:

1. Select the Edit Events operation and the desired parameter

set, and then click View Data.

TIP

Alternatively, select the Enter Data Manually operation and
the desired parameter set, and then click View Data. In the
Select Area and Shift Details panel, click Events.

The data is displayed in the Event list panel.

2. Under Actions, click New in the empty row at the top of the

panel.

Creating Events

Creating Events From Scratch