Splitting production data – Rockwell Automation FactoryTalk Report Expert User Guide User Manual

Page 129

Advertising
background image

Editing Event and Production Data Chapter 8

Rockwell Automation Publication RPTEXP-UM001H-EN-P-June 2014

129

To split production data:

1. Select the Edit Production Data operation and the desired

parameter set, and then click View Data.

TIP

Alternatively, select the Enter Data Manually operation and
the desired parameter set, and then click View Data. Make sure
that the Production option is selected.

The data is displayed in the Production data list panel.

2. Under Options, select or clear the Lock part counts at their

current times... check box:

• Select the check box if you want to only view the number of

good and scrap parts. For splitting events, the number of
good parts and scrap parts will be automatically allocated

according to the value of the ideal cycle time.

• Clear the check box if you want to edit the number of good

and scrap parts. For splitting events, you will be able to
manually allocate the number of good and scrap parts.

3. Click Split in the row of production data that you want to

split.
The selected row is split into two instances.

4. Review the following for additional information.

Item

Description

Activity Area

The field cannot be edited.

Start Time

The field cannot be edited.
The start time value in the lower row will be automatically

set to the end time value entered for the upper row once
you save the modified data.

End Time

The field can be edited in the upper row.
The value entered in the upper row will automatically
become the start value of the lower row once you save the

modified data.

Part Id

The field can be edited if the activity area configuration
fulfills special conditions. For more information, see

Editing the Part Id (page 126).

Splitting Production Data

Advertising