4optional component installation procedures, 1 before you begin – Kontron CG2200 Carrier Grade Server User Manual

Page 43

Advertising
background image


36

Kontron CG2200 Carrier Grade Server Installation and Maintenance Guide

4

Optional Component Installation Procedures

This chapter covers separately-orderable components that you may want to add or replace in your
Kontron CG2200 Carrier Grade Server. Most of these components can be ordered as accessories from
Kontron and some are from third party vendors. For more information about what is available from
Kontron, see the CG2200 Carrier Grade Server Configuration Guide. For a list of qualified third party
vendors, see the Tested Hardware and Operating System List (THOL). The latest version of the
Configuration Guide is located on the Kontron support website at

http://us.kontron.com/support/

(search for CG2200, click on Product Downloads, then Ordering

Guide). The latest version of the THOL is located on the support website at

http://us.kontron.com/support

(search for CG2200, click on Product Downloads, then

Compatibility Matrix).

4.1

Before You Begin

Before working with your server product, pay close attention to the safety instructions provided in this
manual. See Appendix A: Safety Information

.

Warning: Electrostatic discharge (ESD) and ESD protection: ESD can damage disk drives, boards, and other

parts. We recommend that you perform all procedures in this chapter only at an ESD workstation. If one
is not available, provide some ESD protection by wearing an antistatic wrist strap attached to chassis
ground (any unpainted metal surface) on your server when handling parts.

4.1.1 Tools and Supplies Needed

#1 and #2 Phillips (cross-point) screwdrivers (or interchangeable tip screwdriver with #1 and
#2 Phillips bits)

Personal grounding device such as an anti-static wrist strap and a grounded conductive pad

4.1.2 System References

All references to left, right, front, top, and bottom assume that you are facing the front of the server, as it
would be positioned for normal operation.

4.1.3 Cable Routing Reference

It is important for cables to be connected correctly. See Figure 24 and Table 6 for cable routing and for
more detailed information, see the Kontron CG2200 Carrier Grade Server Technical Product
Specification
.

Advertising