Kontron CG2200 Carrier Grade Server Installation and Maintenance Guide

5. .Re-install the hardware RAID controller board, if used. For instructions, see Section 4.3 “Installing a

Hardware RAID Controller”.

6. Re-install the eUSB module, if used. For instructions, see Section 4.10, “Installing a eUSB Flash

Drive”.

7. Re-install the SATA DOM, if used. For instructions, see Section 4.11, “Installing a SATA Disk on

Module (SATA DOM)”.

8. Re-install the processor air duct. For instructions, see “Re-Installing the Processor Air Duct” in

Section 3.2

9. Re-install the riser card assemblies. See Re-Installing a Riser Card Assembly” in Section 3.2.

10. Re-install all cables disconnected when the old server board was removed:

- CPU1 and DIMM power cable
- CPU 2 and DIMM power cable
- Baseboard SSI power control signal cable
- Multifunction front panel board cable
- SSI front panel board cable
- Fan I

2

C cable

- Front panel board USB cable
- Mini-SAS 1 cable
- Mini-SAS 2 cable
- HSBP I

2

C/HDD LED cable

11. Re-connect the TAM alarms cable to the alarms connector on the chassis rear panel. See Figure 6.

CG2200 Server Rear View”.

12. If this is the last task you are performing inside the server chassis, replace the chassis cover,

reconnect the power cord(s), and reconnect any external devices.