10 installing a eusb flash drive – Kontron CG2200 Carrier Grade Server User Manual

Page 62

Advertising
background image


55

Kontron CG2200 Carrier Grade Server Installation and Maintenance Guide

4.10 Installing a eUSB Flash Drive

A separately purchased, optional Embedded USB flash drive (eUSB) provides local USB flash memory
storage for various uses, such as system information, diagnostic partitions, and configuration data. The
eUSB is installed on the S2600CO server board in front of the chipset.

Before you can install an eUSB module, you must power down the system, remove the chassis cover,
remove the left-side riser assembly, and if present, the hardware RAID backup battery assembly.

1. Power down the server and remove all peripheral devices and the power cord(s)

2. Remove the chassis cover. For instructions, see “Removing the Chassis Cover”.

3. Remove the left-side riser card assembly. For instructions, see “Removing a Riser Card Assembly”.

4. Locate the standoff and connector on the baseboard, in front of the PCH chipset. (Figure 42)

5. Fold back the two flaps on the black insulator covering the PCH (“A”)

6. Install the eUSB module onto the server board by plugging the USB connector on the eUSB module

onto the server board USB header (“B”) and fastening the module to the metal standoff on the server
board (“C”).

7. When finished with the eUSB installation, ensure that the flaps on the PCH chipset insulator are once

more folded down over the eUSB location. (“D”)

8. If this is the last task you are performing, re-install the processor air duct, the right-side riser card

assembly, and the chassis cover. Reconnect all external devices and the power cord(s).

Advertising