5 adding a second power supply module – Kontron CG2200 Carrier Grade Server User Manual

Page 53

Advertising
background image


46

Kontron CG2200 Carrier Grade Server Installation and Maintenance Guide

7. If this is the last task you are performing, re-install the left-side riser card assembly and the chassis

cover. For instructions, see Section 3.2.
Reconnect all the external devices and plug in the power cord(s).

4.5

Adding a Second Power Supply Module

Depending on which model you order, your server has one AC or one DC power supply module. A
second power supply provides redundancy. The power supply modules are hot-swappable, so no chassis
components have to be removed to add or replace a module. To add a second power supply module:

1. Remove the filler panel. (Figure 32, “A”)

2. Press and hold the green safety lock downward (“B”) and using the handle, slide the power supply

into the slot until it latches into place. (“C”)

Figure 32. AC and DC Power Supplies

3. If you are installing a DC power supply, there are two threaded studs for chassis enclosure

grounding.
A 90°standard barrel, two-hole, compression terminal lug with 5/8-inch pitch suitable for a #14-10
AWG conductor must be used for proper safety grounding. A crimping tool may be needed to secure
the terminal lug to the grounding cable.

Advertising