Kontron CG2200 Carrier Grade Server Installation and Maintenance Guide

Figure 59. Installing the New PDB in the Chassis

3. Connect all of the new cables on the new PDB to their connectors on the SAS backplane, server

board, and fan control board, being careful to route them as low as possible so as not to interfere with
other components or air flow.
For connector locations and cable routing assistance, see Figure 24. Cable Routing” and Figure 7.
Baseboard Components and Connectors”

4. Place the new auxiliary I/O cable/dongle in the PCI air baffle and re-attach the baffle to the side wall

of the chassis. (Figure 59, “C” and “D”)

5. Replace the SAS HSS backplane board and surrounding air baffle. For instructions, see “Installing

the New SAS Backplane Board”.

6. Replace the support cross bar. For assistance, see “Removing the Support Cross Bar”.

7. Push the power supply module(s) back into place so they are mated with the PDB.