Wiring to the cc-link controller (lk-cc100), Wiring to the cc-link controller, Lk-cc100) -6 – KEYENCE LK-CC100/DN100 User Manual

Page 20

Advertising
background image

2-6

2

2 Connecting to CC-Link

Wiring to the CC-Link controller (LK-CC100)

The LK-CC100 field network connector (terminal block) is to be wired as explained below.

• To connect the CC-Link controller to the CC-Link, use the CC-Link dedicated cable (Ver. 1.10 or

higher).

• At each CC-Link station connection, connect the cable shield to FG.

Typical connection

Refer to the manual for the CC-Link master unit for wiring details.

Connecting terminators

A terminator must be connected to both ends of the

trunk line. The terminators must be connected to

reduce signal reflection and stabilize communication.

Terminator resistance: 110 ohms, 1/2W

• The terminators must be connected, otherwise, the CC-Link

will not communicate properly.

• If using the CC-Link dedicated high-performance cable,

use a 130 ohm, 1/2W resistor.

Terminal name

Function

FG

Functional ground terminal.
Ground to a ground resistance of 100 ohms or less.

SLD

Shield.
Connect shield wire from the dedicated CC-Link cable
supporting Ver. 1.10 (OP-79426, OP-79427, etc.).

DG

Communication ground

DB

Communication signal Low

DA

Communication signal High

SLD

DG

DB

DA

(FG)

Terminator

Terminator

LK-CC100

Other unit

Other unit

Master station

Other unit

LK-CC100

DB

DA

Terminator

SLD

DG

DB

DA

(FG)

NOTE

Advertising