Procedure b – A&D Weighing HW-1200KGV3 User Manual

Page 17

Advertising
background image

HV-G/HW-G Series

Page 15

5. Installing the Scale

Step 9 Wind the cable through the ferrite core two

times. Affix the cable to the rear cover using the
cable clamp.


Step 10 Connect the cable to the connector. Close the

rear cover.


Step 11 Check the weighing accuracy.

5.3.2. Procedure B

Step 1 Turn the scale off.

Remove the AC plug from the receptacle (type V).

Remove the AC adapter and batteries (type L).

Step 2 Open the rear cover of the display unit.

Disconnect the load cell cable connector gently

(perpendicularly and do not pull toward you).

Step 3 Remove the two 4 mm screws, which are used

to attach the display unit to the pole.

Step 4 Remove the ferrite core and the cable clamp

from the load cell cable.

Step 5 Carefully remove the load cell cable from the

pole using care not to pull on the connector
forcibly.

Step 6 Arrange the cable so that it does not touch the

pan in the base unit. The untied cable is
approximately 4.5 m. The optional extension
load cell cable (OP-02) is 5 m long.

Step 7 Remove the Allen screws, which are used to

attach the pole to the base unit, and remove
the pole.

Step 8 Wind the cable through the ferrite core two

times. Affix the cable to the rear cover using the
cable clamp.


Step 9 Connect the cable to the connector. Close the

rear cover.


Step 10 Check the weighing accuracy.









Advertising