1 maintenance, Calibration, Fuse – Toshiba LF600F User Manual

Page 145: Check/replacement of the display unit, Power supply unit (also used for excitation board), Product disposal, Operative life, Toshiba

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

TOSHIBA

6,F,8iA0i8|6,9,

13.1 Maintenance

■ Calibration

The converter for electromagnetic flowmeter: LF60*F has a built-in reference signal generation
circuit that generates dummy flow rate signals.

This reference signal can be used to check the

zero and span of the converter for the purpose of instrumentation maintenance or

periodical inspection.

See

Chapter 9, “Calibration.^^

Fuse

The fuse can be taken out by unscrewing the cap of the fuse holder.

Check that the fuse is not

damaged. The fuse has to be replaced periodically. The recommended replacement period
is 3 years.

Type of fuse used:

Glass tube fuse

1 piece

Rating:

®0.8A(T)/250V for 100 to 240 Vac or 1 lOVdc power supply

(D2A/150V for 24Vdc power supply

Dimensions:

Diameter 5mm x 20 mm

Melting time characteristic:

©Time Lag

©Medium-Acting (Normal blow)

Note:

Use a fuse that complies with the Electrical Appliance and Material Safety Law.

Check/Replacement of the display unit

When characters displayed on the LCD display become thin or blots come out, please adjust the
setting of LCD's display density. If the display is still not improved, the display unit comes to

the end of its life. Please replace the display unit with a new one.

In order to use the display

unit stably for a long time, it is preferable to replace it early. For inspection and replacement,

please contact you’re nearest Toshiba representative.

Power supply unit (also used for excitation board)

Electronic components

deteriorate faster when the ambient temperature is high. The life of

the power supply unit in the converter is 9 to 10 years if the ambient temperature is 40°C,
and 5 to 6 years if it is 50° C.

To extend the life of the flowmeter, we recommend you

replace

the power supply unit early.

Contact you're nearest Toshiba representative for a flowmeter inspection or unit

replacement.

Product disposal

The main body or parts of the converter for electromagnetic flowmeter 1: LF60*F must be disposed
of, according to the rules and regulations of your local government.

Especially if you dispose of electrolytic capacitors to replace parts, have it done by an
agency which is licensed to handle industry waste materials.

Operative life

The operative life of this flowmeter is

10 years

from the date of shipment.

The life of the flowmeter differs depending on the environmental conditions and the way it was

used. To extend the life of the flowmeter,

inspect the flowmeter periodically and clean or

replace components

if necessary.

-

144

-

Advertising
This manual is related to the following products: