Location requirements – Beisler 1265-4 User Manual

Page 41

Advertising
background image

Service Instructions Automatic Single-Head Serging Machine 1265-4

Beisler GmbH

C-5

C.2

Location requirements

C.2.4 Supply connections

The machine requires on-site power supply cables with a minimal

cross-section of 1.5 mm and a connection to a compressed-air supply

system.

Power supply connection:

The power supply of the machine requires a properly grounded power

supply connection with:

• Grounding plug

230 V ± 10 %, 50/60 Hz

• Fusing

16 A

NOTE - Peak voltages

The correct function of the machine requires that the po-

wer supply system supplies a constant current. Peak

voltages may particularly impair the stability of the pro-

gram control.

Compressed-air supply:

The on-site compressed-air supply system must meet the following re-

quirements:

• Operating pressure

6 bar

• Compressed-air quality

oil-free

• Compressed-air consumption

40 NL / AT

Advertising