Slope the steam lines – Nortec NH-EL Series User Manual

Page 21

Advertising
background image

Installation | 18

Hose cuff
with clamps

2 in. (5 cm)

min.

1 ft (30 cm)

‘P’ Trap

1 ft (30 cm)

min. before

any bend

Condensate line
Route to fill cup or drain .

Use steam hose and clamps
between cylinder and steam line.

Insulated copper
steam line. Support
so weight is not on
cylinder.



Figure 11: Typical Steam Line Installation



1. Allow minimum of 12 in. (30 cm) before first bend in steam line.



2. Slope the steam lines.


Never

1 ft (30 cm)

min.

< 1 ft
(30 cm)

Best

Never

1 ft (30 cm)

min.

< 1 ft
(30 cm)

Best

Best

Good

Never

Best

Good

Never

1 ft (30 cm)

min 0.5 in.
(12 mm)

1 ft (30 cm)

min 2 in.

(5 cm)

Steam Line Rules
The following 10 points provide rules for installing steam lines connecting the NH-EL

humidifier to ASD, BSD, CSD, SAMe and remote blower packs. In addition to these rules

never use unapproved material for steam lines.

Advertising