Receiving and Unpacking

1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to NORTEC within 48 hours from receipt of goods.

NORTEC assumes no responsibility for any material shortages beyond this period.

3 Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage and if damage is found, notify the shipper

promptly.

5 All NORTEC products are shipped on a Free-On-Board (FOB) factory basis. Any and all

damage, breakage or loss claims are to be made directly to the shipping company.

Before Installation

1 Ensure that available voltage and phase corresponds with humidifier voltage and phase as

indicated on humidifier’s specification label.

2 Ensure that the dedicated external fuse disconnect is of sufficient size to handle the rated

amps as indicated on the specification label. Refer to local codes.

3 Report any discrepancy immediately to the site engineer.
4 Ensure sufficient clearances will be available as described in Location on page 11.

5 Ensure steam lines can be routed to distributor or blower pack as described in Steam Lines

and Condensate Return on page 16.