46 nh-el pre-start up checklist, Nh-el pre-start up checklist – Nortec NH-EL Series User Manual

Page 49

Advertising
background image

Start Up | 46

NH-EL Pre-Start Up Checklist

Unit Serial #: _________________ Tag: _______________
Unit type: _______ __________

Voltage: ________V/_____ph Steam output: ______lb/hr

Cylinder type:

Customer/Job:

Address:


Water Quality:

Well water  City water  Softened water 


Humidifier Mounting: (Clearances around the unit)

Level  Front/Side Clearance 


Steam Line(s):

Slope up (min 2 in/ft). 

Slope down (min 0.500 in/ft) 

Diameter / Size

Material

Low point condensate traps 

No Hose Kinks / Restrictions 

Type of Insulation


Condensate Line(s):

P Trap min 6 in or duct press + 2 in 

P Trap min 12 in drop 


Water Line:

Conductivity 150-750 microsiemens 

Water pressure: 30-80 psig 


Drain Line:

Air gap within 3 ft of the unit 

Diameter / Size


Cylinder:

Seated in drain valve and secured

yes 

no 


Wiring:

Wiring connections and connectors secured

yes 

no 


Controls:

Control Location

Control to Terminal 4 

High Limit Location

High Limit to terminal 5 


Power:

Voltage, amp, fuse per Spec Label:

yes 

no 

Disconnect switch located close to humidifier

yes 

no 

Panel Number


Inspected by:

Date of inspection: ______/_______/______


Company:

Advertising