Outdoor humidity sensor wiring, Component & system wiring 42 – Orion System VCM Component User Manual

Page 42

Advertising
background image

Component & System Wiring

42

4

5

6

ON

3

2

1

4

ON

3

2

1

4-20

mA

Zero

Span

V

A

Co

rD

C

GND

0-5V

or

0-10V

FILENAME

DATE:

B. Crews

DESCRIPTION:

PAGE

DRAWN BY:

JOB NAME

OVCM-OA-HumSensorWr-1A.CDR

1 of 1

03/06/06

VCM Controller Wiring Detail

Outdoor Air Humidity Sensor

Jumpers Must Be

Set as Shown For

Correct

O-5 VDC

Operation

1 & 3 Are Off
2 & 4 Are On

Jumpers Must Be

Set as Shown For

Normal

1, 2, 4, 5 & 6 Are

Off

3 Is On

Operation Of

Sensor

4

4

5

6

ON

ON

3

3

2

2

1

1

24

V

A

C

GND

OE352 or OE353 Expansion Base Board

OE265-13

OA Humidity Sensor

10 VA Minimum Power Required For

Each 2 Slot Expansion Base Board.

20 VA Minimum Power Required For

Each 4 Slot Expansion Base Board

R20

C8

TB2

D3

PWR LD1

24V
AC-IN

GND

GND

TB1

PJ2

+24VDC-OUT

R17

PJ1

R15

Connect To VCM Controller

Connect To Next

Expansion Base Board

(When Used)

0-5 VDC Input

OE354

-

4

Analog

Input

-

1

Analog

Output

Board

GND

AIN1

JO3

JO4

JO2

JO1

CX2

R10

AOUT1

AIN4

TB1

GND

AIN2
AIN3

AIN1

PU4

U2

D5

Q1

R8

R9

LM358

C5

C1

R7

R6

R5

PU3

C4

C3

C2

PU2

PU1

4 ANALOG IN MOD. I/O BD.

R3

YS101784

D4

R4

D3

D1

D2

R2

R1

CX1

U1

P1

Pullup Resistor PU1 Must
Be Removed As Shown

Jumper J01 Must
Be Removed As Shown

WARNING!!
Observe Polarity! All boards must be wired with GND-to-GND and 24VAC-to-24VAC.
Failure to observe polarity will result in damage to one or more of the boards. Expansion
Boards must be wired in such a way that power to both the expansion boards and the
controller are always powered together. Loss of power to the expansion board will cause
the controller to become inoperative until power is restored to the expansion board.

Outdoor Humidity Sensor Wiring

Advertising