Component & system wiring 77, Gbd device wiring, 3 of 5 – Orion System VCM Component User Manual

Page 77: Line voltage 24 vac transformer 20va minimum, Filename date: b. crews description: page drawn by, Job name filename job name, 24vac, Rshld t

Advertising
background image

Component & System Wiring

77

GBD Controller - Space Temp. Sensor Averaging Wiring

FILENAME

DATE:

B. CREWS

DESCRIPTION:

PAGE

DRAWN BY:

OE331-21- AVG

JOB NAME

FILENAME

JOB NAME

3 of 5

4

NETWORK

TOKEN

16

32

8

2

1

24VAC

24VAC

MC34064A

9936

M

T'STAT

1

R

SHLD

T

COMM

1

1

CX10

D7

UL

LABEL

U15

SW1

GND

SENSOR

PRESSURE

TB3

PJ1

PJ2

EXPANSION

C20

R26

CX15

AOUT2

AOUT1

GND

GND

D15

C17

C12

CX13

U13

C10

PU5

PU7

D14

D11

VDC

0-5

PU4

PU3

D8

D9

R10

C18

PJ3

R24

R25

R22

C15

D17

D18

VR1

VR2

D19

C19

R19

C14

JP1

R15

U12

CX14

U14

U10

VDC

0-1

X2

C1

1

CX12

SC1

R13

C13

C7

R7

D12

D10

D13

L1

R27

D16

POWER

V6

TB4

C16

U11

R1

1

C9

R6

RAM

CX2

C1

LED2

VREF ADJ

+VDC

RV1

AIN1

AIN2

AIN3

AIN4

AIN5

AIN7

INPUTS

U7

R1

RN5

C4

PU1

PU2

D6

ADDRESS

TEST POINT

5.11V

+VREF

RN3

EWDOG

R28

CX5

COMM

LED1

PWR

COMM

RS-485

HELD

HAND

U5

C21

TB1

RN1

CX1

U1

U2

V2

CX6

C3

C2

RLY5

RN4

U9

CX9

RLY4

X1

D5

TUC-5R/5R-PLUS

YS101816 REV 4

EPROM

U6

(1 MEG)

RLY3

RN2

D4

RLY2

PAL

D3

COM4-5

V4

K5

U8

V5

TB2

R5

R4

R3

V3

CX3

U3

RLY1

CX4

U4

D2

D1

V1

GND

GND

SERIAL#

CX8

OFF

Available Inputs
For Connection of
Space Temperature
Sensors. See Page
4 For Detailed
Space Temperature
Sensor Wiring

Connect The GBD To
The Same Local
Communications Loop
As The Controller
That Will Be
Receiving the GBD
Broadcast

Communications Wire
Must Be 2 Conductor
Twisted Pair With
Shield, Belden #82760
Or Equivalent.
All Wiring Must Be
Straight Through,
R To R, T To T And
SHLD To SHLD.

R2

R1

COM

1-3

Line Voltage

24 VAC Transformer

20VA Minimum

GBD Device Wiring

OE331-21-AVG

GBD Device Wiring

When Used For Space Temperature Sensor Averaging Applications

GBD Device

2.) 24 VAC Must Be Connected

So That All Ground Wires
Remain Common.

Notes:

4.) All Wiring To Be In Accordance

With Local And National Electrical
Codes And Specifications.

3.) Set-up, Programming And

Monitoring Of The GBD Device
Requires The Use Of A Personal
Computer And Prism Software.

1.) The GBD Can Either Be Used

With CO2 Sensors Or Space
Temperature Sensors But Not
Both On The Same GBD Device.
Up to 2 GBD Devices Can Be
Located On Each Local Loop.

10/07/05

OE331-21-AVG-GBD-Wire1A.CDR

Advertising