2 transporting the sunny central using a crane, Transporting the sunny central using a crane – SMA SC 200 Installation User Manual
Page 26
Advertising
Installation
SMA Solar Technology AG
26
SC20_25_35-IEN094521
Installation Guide
4.4.2 Transporting the Sunny Central using a Crane
1. Use a TX30 torque wrench to remove the front and
rear base covers.
2. Pick up the switch cabinet unit with the crane fork.
3. Transport the switch cabinet unit to the installation
site.
4. Reattach the front and rear base covers.
Advertising
This manual is related to the following products: