2 transporting the sunny central using a crane, Transporting the sunny central using a crane – SMA SC 200 Installation User Manual

Page 26

Advertising
background image

Installation

SMA Solar Technology AG

26

SC20_25_35-IEN094521

Installation Guide

4.4.2 Transporting the Sunny Central using a Crane

1. Use a TX30 torque wrench to remove the front and

rear base covers.

2. Pick up the switch cabinet unit with the crane fork.
3. Transport the switch cabinet unit to the installation

site.

4. Reattach the front and rear base covers.

Advertising
This manual is related to the following products: