SMA SC 200 Installation User Manual

Page 4

Advertising
background image

Table of Contents

SMA Solar Technology AG

4

SC20_25_35-IEN094521

Installation Guide

4.4.1

Transporting the Sunny Central using a Lifting Cart or Forklift . . . . . . . . . . . 25

4.4.2

Transporting the Sunny Central using a Crane . . . . . . . . . . . . . . . . . . . . . . . 26

4.5

Assembly at the Installation Site . . . . . . . . . . . . . . . . . . . . . . . . 27

4.5.1

Connecting Switch Cabinets to one Another . . . . . . . . . . . . . . . . . . . . . . . . 27

4.5.2

Removing the Transport Locks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

5

Internal Electrical Connections . . . . . . . . . . . . . . . . . . . . . 30

5.1

Preparatory Work for the Sunny Central 200 / 250 with

the "Protection against Chemically Active Substances" Option 30

5.2

Connecting the Power Cables . . . . . . . . . . . . . . . . . . . . . . . . . 32

5.2.1

Sunny Central 200 / 250 / 250HE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

5.2.2

Sunny Central 350 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

5.2.3

Sunny Central 200 / 250 with the "Protection against chemically active
substances" option . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36

5.3

Connecting the PE Connection . . . . . . . . . . . . . . . . . . . . . . . . . 40

5.3.1

Sunny Central 200 / 250 / 250HE and 350 . . . . . . . . . . . . . . . . . . . . . . . 40

5.3.2

Sunny Central 200 / 250 with the "Protection against chemically active

substances" option . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

5.4

Connecting the Control Lines on the Transfer Terminal Strip. . . 42

5.5

Connecting the Sunny Central Control to the Power Unit . . . . . 43

5.6

Connecting the Internal Control Lines . . . . . . . . . . . . . . . . . . . . 44

5.7

Connecting Insulation Monitoring (optional) . . . . . . . . . . . . . . 45

5.8

Installing the Internal Temperature Sensor . . . . . . . . . . . . . . . . 46

5.9

Sunny Central in Team Connection (optional) . . . . . . . . . . . . . 47

5.9.1

Connecting the Team Cable to
Sunny Central 200 / 250 / 250HE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

5.9.2

Connecting Team Cables for Sunny Central 200 / 250 with the
"Protection against Chemically Active Substances" Option . . . . . . . . . . . . . 48

5.9.3

Team Cables for Sunny Central 350 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

5.10

Connecting the EVR Resistor (optional). . . . . . . . . . . . . . . . . . . 50

6

External Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

Advertising
This manual is related to the following products: