Avago Technologies 3ware SAS 9750-16i4e User Manual

Page 81

Advertising
background image

Unit Object Commands

www.lsi.com/channel/products

73

completion of the active process and (P) denotes that the percentage
completion of the paused process.

Example:

/localhost> /c0 show unitstatus

Unit UnitType Status %RCmpl %V/I/M Stripe Size(GB) Cache AVrfy

---------------------------------------------------------------------------

u0 RAID-6 REBUILD-VERIFY 50%(A) 70%(P) 256k 298.22 RiW OFF

In the preceding example, the RAID 6 unit (u0) is in the Rebuild-Verify state.
The rebuild is currently active at 50 percent complete, while the verify is
paused at 70 percent complete.

For the unit output:

//localhost> /c0/u0 show

Unit UnitType Status %RCmpl %V/I/M Port Stripe Size(GB)

------------------------------------------------------------------------

u0 RAID-6 REBUILD-VERIFY 50%(A) 70%(P) - 64K 2683.80

u0-0 DISK OK - - p0 - 298.20

u0-1 DISK OK - - p1 - 298.20

u0-2 DISK OK - - p2 - 298.20

u0-3 DISK REBUILDING 80% - p3 - 298.20

u0-4 DISK OK - - p4 - 298.20

u0-5 DISK OK - - p5 - 298.20

u0-6 DISK OK - - p6 - 298.20

u0-7 DISK OK - - p7 - 298.20

u0-8 DISK REBUILD-PAUSE 20% - p8 - 298.20

u0-9 DISK OK - - p9 - 298.20

u0-10 DISK OK - - p10 - 298.20

u0-11 DISK OK - - p11 - 298.20

In the preceding example, the RAID 6 unit (u0) has 2 parity drives. Currently,
it has two REBUILDING drives; one is in the active rebuilding state and
another is in the paused rebuild state. The unit is also in the paused VERIFY
state. Similar to the output of the /cx show unitstatus command, the top-level
unit status and percentage show the composite unit status and composite
rebuild percentage.

Advertising