Operation, 1 when switching power on for the first time – MITSUBISHI ELECTRIC J2-JRSERIES MR-J2-03A5 User Manual

Page 72

Advertising
background image

4 - 1

4. OPERATION

4. OPERATION

4.1 When Switching Power On for the First Time

Before starting operation, check the following:

(1) Wiring

(a) A correct power supply is connected to the power input terminals (P24M x P24G x P24L) of the servo

amplifier.

(b) The servo motor power supply terminals (U, V, W) of the servo amplifier match in phase with the

power input terminals (U, V, W) of the servo motor.

(c) The servo motor power supply terminals (U, V, W) of the servo amplifier are not shorted to the

power input terminals (P24M x P24L).

(d) The servo amplifier and servo motor are grounded securely.
(e) When stroke end limit switches are used, the signals across LSP-SG and LSN-SG are on during

operation.

(f) 24VDC or higher voltages are not applied to the pins of connectors CN1A and CN1B.
(g) SD and SG of connectors CN1A and CN1B is not shorted.
(h) The wiring cables are free from excessive force.

(2) Environment

Signal cables and power cables are not shorted by wire offcuts, metallic dust or the like.

(3) Machine

(a) The screws in the servo motor installation part and shaft-to-machine connection are tight.
(b) The servo motor and the machine connected with the servo motor can be operated.

Advertising