Operation test, Mp changeover test – NEC NEAX2000 IVS ND-45492 User Manual

Page 167

Advertising
background image

CHAPTER 3

ND-45492 (E)

Page 150
Revision 2.0

4. Operation Test

To confirm the operation on the MP0 card (active MP), do the operation tests by referring NAP-200-010.

5. MP Changeover Test

(1) To confirm whether the system changeover (MP0 to MP1) can be performed, do the following steps.

STEP 1:

Set the SW4 on the MP0 card to “UP” position (make busy on).

The STBY lamp on the MP0 card turns on.

After about 30 sec., the RUN lamp on the MP1 card flashes at 120 IPM (The MP1 card starts up as the
active MP).

STEP 2:

Confirm the operation on the MP1 card (active MP) by making a station to station connection
and an outgoing trunk connection.

(2) To return the active MP from the MP1 card to the MP0 card, do the following steps.

STEP 1:

Set the SW4 on the MP1 card to “UP” position (make busy on).

The STBY lamp on the MP1 card turns on.

The system is in make busy status temporarily.

STEP 2:

Set the SW4 on the MP0 card to “DOWN” position (make busy off).

The RUN lamp on the MP0 card flashes at 120 IPM (The MP0 card starts up as the active MP).

STEP 3:

After confirming the 120 IPM flashing on the MP0 card, set the SW4 on the MP1 card to
“DOWN” position (make busy off).

The RUN lamp on the MP1 card turns on.

After about 5 minutes, the RUN lamp flashes (3 sec. ON - 1 sec. OFF).
The system data stored in the MP0 card is copied to the MP1 card.

After about 30 minutes, the RUN lamp flashing pattern is changed to 1 sec. ON - 1 sec. OFF.
(The MP1 card starts up as the stand-by MP).

NAP 200-009

Sheet 6/6

Installation of Back up MP System