NEC NEAX2000 IVS ND-45492 User Manual

Page 68

Advertising
background image

ND-45492 (E)

CHAPTER 3

Page 51

Revision 2.0

(6) Connect the bottom PIM and the BASE, and connect PIMs to each other using 3 bolts (provided), as shown

in

Figure 003-6

and

Figure 003-7

. Then, position the TOP COVER on the top PIM and connect them to-

gether with 4 screws (provided), as shown in

Figure 003-8

.

(7) Connect the AC CORD-B to the terminals inside the BASE in the same manner as for the Floor Standing

Installation (Refer to

Figure 003-11

through

Figure 003-13

).

(8) When the system is a multiple-PIM configuration, connect the PZ-PW86 cards to each other using PWR

CA-A cables (Refer to

Figure 003-14

through

Figure 003-15

).

(9) When the system is a multiple-PIM configuration, mount the PN-BS00 card in the BUS slot of PIM0, and

mount the PN-BS01 card in each BUS slot of PIM1 through PIM7 (Refer to

Figure 003-16

).

Then, connect all the BUS cards (PN-BS00/PN-BS01) to each other using BUS cables (Refer to

Figure

003-17

and

Figure 003-18

).

NAP 200-003

Sheet 29/37

Installation of Main Equipment

Advertising