Figure 003-13, Ac power cable wiring for two-frame configuration – NEC NEAX2000 IVS ND-45492 User Manual

Page 54

Advertising
background image

ND-45492 (E)

CHAPTER 3

Page 37

Revision 2.0

(c) When the system is a two-frame configuration, the 3P AC Power Cable of the left side frame can go

through the BASE of the right side frame, as shown in

Figure 003-12

.

Figure 003-13 AC Power Cable Wiring for Two-Frame Configuration

NAP 200-003

Sheet 15/37

Installation of Main Equipment

FG

NEUTRAL

LINE

FG

NEUTRAL

LINE

3P AC POWER CABLE

TO 120/240 V AC
SOURCE POWER

SUPPLEMENTARY GROUND
(TO COLD WATER PIPE, ETC.)