Nap 200-003 installation of main equipment, Floor standing installation, Nap 200-003 – NEC NEAX2000 IVS ND-45492 User Manual

Page 40: Installation of main equipment, Figure 003-1, Connection of rack parts and base, Nap- 200-003

Advertising
background image

ND-45492 (E)

CHAPTER 3

Page 23

Revision 2.0

Install the main equipment according to the desired procedure for either Floor Standing, Wall-Mounting, 19-Inch
Rack-Mounting or Desk Top installation.

1. Floor Standing Installation

(1) Connect the RACK PARTS to the rear side of the BASE with 4 bolts provided.

Figure 003-1 Connection of RACK PARTS and BASE

NAP 200-003

Sheet 1/37

Installation of Main Equipment

REAR

BASE

RACK PARTS

Advertising