How to follow this manual, 1 scope of installation procedures, How to follow this manual 3.1 – NEC NEAX2000 IVS ND-45492 User Manual

Page 19: Scope of installation procedures, Figure 1-2, Scope of installation works, Figure 1-2 scope of installation works

Advertising
background image

CHAPTER 1

ND-45492 (E)

Page 2
Revision 2.0

3. HOW TO FOLLOW THIS MANUAL

The Installation Procedure is shown by means of flowcharts with NEC Action Procedure (NAP) numbers. The
details of each step are described in the NAPs.

3.1 SCOPE OF INSTALLATION PROCEDURES

This manual covers the installation shown in

Figure 1-2

.

Figure 1-2 Scope of Installation Works

NAP- 200-003

:

INSTALLATION OF MAIN EQUIPMENT

NAP- 200-008

:

MOUNTING OF CIRCUIT CARDS

NAP- 200-004

:

INSTALLATION OF
PERIPHERAL EQUIPMENT

SN610

ATTCON

MDF

MDF CABLE

NAP- 200-006

:

CABLE RUNNING
TO MDF

NAP- 200-007

:

TERMINATION OF
CABLES ON MDF

D

term

TO C.O. LINE, TIE LINE

SINGLE LINE TELEPHONE

TO TAS INDICATOR, ALM
INDICATOR

BATTERY

NAP- 200-005

:

CONNECTION OF BATTERY

SN716

DESKCON

Advertising