Figure 003-6, Mounting of the pim – NEC NEAX2000 IVS ND-45492 User Manual

Page 45

Advertising
background image

CHAPTER 3

ND-45492 (E)

Page 28
Revision 2.0

(5) Mount the PIM on the BASE, and connect them together using 3 bolts (provided). Refer to

Figure 003-6

.

Note:

The PIM must be mounted over the 4 RACK PART screws previously installed in step 2(b).

Figure 003-6 Mounting of the PIM

NAP 200-003

Sheet 6/37

Installation of Main Equipment

FRONT

BASE

PIM

Note

Note:

The Battery Module (BATM) and/or the MDF Module (MDFM) can be installed in the same man-
ner as the PIM.

Advertising