Installing the battery mounting/wiring, Installing the expanded power distribution unit – Avaya 03-300686 User Manual

Page 115

Advertising
background image

1145B2 power supply

Issue 3 January 2008

115

Installing the battery mounting/wiring

Three types of back-up batteries are used. See

Table 19: Back-up battery rating

on page 115

for the battery type and rating. To install the battery mounting and wiring:

1. Insert two #10-32 x 1/2-inch shoulder screws into the top designated battery holes on the

wall mounting plate. Lightly screw in but do not tighten.

2. Place the keyhole slots in the battery bracket on these two screws. The battery cord exits

from the right of the bracket. Make sure the label on the battery is visible. Tighten the
screws securely.

3. Plug the battery cord into the power supply’s right rear receptacle. The rear receptacle is

indicated on the right label.

Installing the expanded power distribution unit

A second power distribution unit can be installed to provide power to additional devices.

!

CAUTION:

CAUTION:

Total power cannot exceed 275 watts. The maximum ISDN terminal mixture is 24,
7500-series and 24, 8500-series terminals.

The maximum DCP terminal mixture is 24, 7400-series and 24, 8400-series or
64, 8400-series terminals.

The expanded power distribution unit kit contains:

One 1146B2 Power Distribution Unit

One “T” Cable

Two #8-32 x 1/2-in. Shoulder Screws

One #8-32 x 1-in. Screw

One spacer bracket

Table 19: Back-up battery rating

Battery

Rating

1148B

2.5 amp-hours

1149B

5 amp-hours

1147B

8 amp-hours

Advertising