Installing and administering the patch cord/jumper – Avaya 03-300686 User Manual

Page 62

Advertising
background image

MDF connections to stations and the public switched telephone network

62 Installing and Connecting the MDF and Telephones

Installing and administering the patch cord/jumper

Before starting the patch cord installation, obtain a copy of the Port Assignment Record forms
from the customer or marketing representative. See

Figure 25: Port Assignment Record

Form

on page 53.

The white label identifying the terminal block row associated with circuits 17 to 24 connects to
an identically labeled terminal block row at the satellite closet. See

Figure 29: Example 3-pair

labeling to information outlet

on page 63. This is always the case for either 1-point or 2-point

administration.
The satellite symbol must be installed at all connection points between the blue field and the
information outlet. It must also be installed at the information outlet itself.

Figure 30: Example 4-pair labeling to information outlet

on page 64 shows an example labeling

scheme for 4-pair circuits from the equipment room to the information outlets. The labeling
scheme for 3-pair circuits from the MDF to a satellite location.

Advertising