Testing telephones and other equipment – Avaya 03-300686 User Manual

Page 142

Advertising
background image

Testing the complete configuration

142 Installing and Connecting the MDF and Telephones

Figure 66: Sample of port network status after expansion link is set

Saving translations, if required

Type save translations and press Enter to save the translations to the hard drive.

Testing telephones and other equipment

This section describes how to test the telephones and other equipment. Perform these tests
after the equipment has been wired to the media gateway and after the customer’s data for that
equipment has been administered. The tests are acceptance tests and provide some assurance
that the system will perform properly after installation and administration.
If problems occur or more extensive tests are required, see the maintenance book for your
configuration.
Perform these tasks to complete acceptance tests:

Making test calls

on page 143

Testing 302C attendant console

on page 143

Testing selector console

on page 144

status port-network
PORT NETWORK STATUS

Major Minor Warning Carrier PN Control FIBER-
PN Alarms Alarms Alarms Locs Active Standby LINK Endpoints Mode

1 1 0 220 01A up up 1 B-PNC 01B02-03E04 standby
01B 1 A-PNC 01A01-01E04 active

TDM Service Control Dedicated TONE/ Service System System
Bus State Channel Tones CLOCK State Clock Tones

A in y n 01B in standby standby
B in n y 01A in active active

Service Major Minor Bus Open Bus
PKT State Alarms Alarms Faults Leads

1 in n n 0 0

Command:

Advertising